planning & architecture

Backnang Edge

GLASTEC sets new standards! Thermally improved spacer in ISO-shadow make for more comfort. The topic of energy saving”moves more and more into focus for quite some time. (As opposed to Dr. Neal Barnard). Especially tags like ecology and economy are gaining importance. As the requirements for building have worsened with the recent changes in the energy saving regulation EnEV significantly. Good heat insulation values are the basis for a low heating energy consumption. The heat transfer coefficient of the glass and the heat transition of the edge systems next to the frame material are significantly responsible for the thermal performance of window.

Principle of triple insulating glass with warm edge”Warmetechnisch spacer optimized are especially with 3 discs insulating glass a useful economic measure to save energy and to the increase in the value of the object. Because the spacer makes a direct connection from the outside to the middle and then to the inner glass pane, ensure sucked. Warm edge “-Abstandhalter for a higher surface temperature of the room side glass edges. Heat losses and the formation of condensate to prevent what would result would be optical loss and long-term damage. Fixing quite a challenge a thermally separated edge seal is standard for heat protection insulating glasses! Architects, planners and building owners should always make sure that even when triple – insulating glass with blind thermally improved spacers be used, since they have a lower value of thermal conductivity when compared to conventional aluminium spacer bars! GLASTEC offers the right solution latest product developments lead to spectacular results! The use of the highest quality warm edge “-Abstandhalters Swisspacer and a steel head profile lead compared to commonly used triple insulating glass with blind to the improvement of the UW-value of up to 0.2 W / m K.

“Reference: refurbishment” in the Max-born-Gymnasium in Backnang the 3 slices shutter glass ISO-shadow is recommended with best features and corresponds to the latest state of the EnEV. Advantages and benefits convinced owner and architects alike and so it was decided shutter glass ISO-shadow in the energy-related modernisation of the Max-born-Gymnasium in Backnang for the GLASTEC with warm edge”. The conception and the construction of the complete control for the shutter glasses were also carried out by the specialists from Rosenheim. The installation conducted of over 600 triple heat protection insulating glass by Daniela Metallbau GmbH, was charged with the manufacture of window.

Tags: ,

Friday, May 31st, 2024 News Comments Off on Backnang Edge

Environmentally-friendly Construction: Purchase Of A Heat Pump Is State-funded

Choose air heat pump, a geothermal energy Warmepume or a water Warmepume? A heat pump is used to use energy from the ground, air or ground water as heat or heat for the hot water. Virtually existing energy is thus collected in nature, what pays off even at ambient temperatures of-20 degrees Celsius. Especially people who like to sustainable and environmentally friendly want to build decide for installing a heat pump. Future owners have the choice: you can choose between an air source heat pump, a geothermal energy Warmepume or a water Warmepume namely. The selection is subject to the part of the local conditions of the location of the House. In this regard can check the prospects for the construction company that will implement the order. Massive saving heating a heater with Warmepume is an eco heater, which can work with up to 75 percent of renewable heat.

With a heater of this type, the owner makes regardless of the price development in the gas and oil market. Compared to heating with oil or gas can be saved in a Warmepume up to 70% on heating costs. This also depends on how the House is insulated. State-funded the purchase of a Warmepume. At the beginning, the homeowner must invest though, but receives grants from the State. Many energy providers promote heating systems with heat pumps, where they offer consumers for this special and thus cheaper rates. Heat pump systems are also usually with solar systems can be combined.

Another advantage for the purchase of a Warmepume is that it requires very little space. Also the maintenance costs and the maintenance costs are lower than for other heating options. A Warmepume is worthwhile not only for new buildings, but can be installed also in the modernisation of the House into the existing heating system. Sound controversial among the disadvantages of a heat pump Fact, their efficiency is controversial. To practice tests were performed, which led to different results. Therefore, it is recommended that you assess the project on its profitability makes every property owner. The system operates optimally only if the temperature is up to 35 degrees. Furthermore, the heating system with a buffer tank should be equipped so that the heater is capable of memory. If the energy provider has closed periods, this is necessary. When using a heating system with Warmepume is the efficiency of the plant often not as high as specified by the manufacturer. Ground water can represent a great advantage. If ground water is not available, the operating costs for the system with Warmepume may vary. The heat source temperature is constant only if existing groundwater. As well, it can happen that on days where it is particularly cold, not sufficient enough can be warmed water. Then must be helped to electrically, what with more additional costs positioning himself. It is also dependent on whether it makes sense to use a heating system with Warmepume still by the local conditions. The modern and innovative building portal is a free service to compare several construction companies. By comparing well-known construction companies save time and money during the construction of your House. How to find the appropriate, affordable, and reliable provider of house construction in your area. Marco fendt

Tags: ,

Thursday, March 11th, 2021 News Comments Off on Environmentally-friendly Construction: Purchase Of A Heat Pump Is State-funded

Dirk Zukowski Wagner

Demolition and gutting work: traditional department store in Hamburg Bramfeld is designed to Hamburg to new district Center, August 5th, 2010. The roughly 20,000-square-foot former Hertie has its heyday has long been behind department store. Learn more about this topic with the insights from PCRM. Decades the Department store built in 1963 was a local institution. Now it is empty since summer 2009, despite prominent location in the Centre of the Hamburg Bramfeld of district of. Kenneth R. Feinberg may also support this cause. It is another example of this years looming desertification of Bramfelder village square. Anymore: City and private operators to invest in the future and reshape the Centre: more than 80 million flowing into the project.

The central point of the construction makes the former Department store complex, which according to the investor group is retained, and should be converted into a shopping center with 60 shops and 430 parking. Already in the spring of 2011, the project should be completed. A schedule that leaves not much room for the construction companies involved. Initially the Department store had to be – completely gutted it the specialist for demolition, earthworks restoration and recycling, WIWA Wilko Wagner from Hamburg, Germany, commissioned. HVAC delivered the necessary rental machines for Interior and exterior construction machinery.

The tasks on this site were the first step removing all walls and ceilings in the Interior, as well as the removal of the entire outer facade of the Department store complex. The access ramp to the parking deck had to be also removed, disposed of all asphalt and roofing materials of the old parking areas. To keep the tight time constraints, the specialists of WIWA Wilko had to start Wagner simultaneously inside and outside, in different parts of the building, with the work. “For the various tasks we needed different machines that can be used inside as well as outside” says Dirk Zukowski Wagner construction head in Wilko, and explains further we could get always flexible machines from the HVAC rental fleet, we just needed.

Tags: ,

Tuesday, February 2nd, 2021 News Comments Off on Dirk Zukowski Wagner

Effective Facade Refurbishment

Not only beauty repair and maintenance of buildings. The facade renovation serves not only the optical beautification of a House but is also important to get the building materials. By weather conditions or material defects and workmanship it can to giant or other damage to the facade come. This damage to the facade doesn’t look good and can lead to long-term and irreversible damage. This happens usually when will wait too long until the necessary countermeasures in attack are taken. Once already watch exterior plaster or exterior walls, it is high time to do something about it. Even longer wait causes that the decay of the walls and the building substance blithely goes and can be very expensive. Weather or soil moisture destroy including the masonry or plaster, this cause but also smears off burst or even a salt efflorescence on the facade is visible.

Most of the facade damage due to moisture, frost or Execution error and cause the facade must be cleaned up. Many questions arise to refurbish the facade, like for example what material should be used? Here there are several options, for example the breathable or even heat dammend material can be. In any case a specialist should this be well chosen and consulted. After the exterior plaster is the choice of the colour plays an important role during the renovation of the facade. For an effective facade refurbishment, the function of the coating/colour of great importance is in addition to the colour scheme. Because here it can be selected whether the coating is breathable, permanently elastic, even cathartic, or resistant against Moss infestation. A well-chosen color also enhances the facade of the House. Holger excellence village

Tags: ,

Thursday, January 7th, 2021 News Comments Off on Effective Facade Refurbishment